Descargar Imprimir esta página

Grohe Roman Tub Combination 25 580 Manual Del Usuario página 5

Publicidad

Idiomas disponibles

Idiomas disponibles

953971.book : I95397US.FM Seite 2 Mittwoch, Juni 17, 1998 3:22 PM
5-Hole
Cold
Hot
3-Hole
Hot
Installation
Layout dimensions to establish centers and proper
clearences, see dimensional drawings on fold-out
page I.
Before soldering:
Prepare components.
Side valves, see fig. [3] and fold-out page II.
[3]
Screw out the ceramic cartriges (5 and 6), see fold-
out page I.
Fit side valves to deck, the distance from the top of
the side valve body to deck must be 1/2" (13mm),
see fig. [3].
Diverter, see fig. [3] and fold-out page II.
Loosen cap (A) and detach escutcheon (14).
Screw out diverter cartridge (13), see fold-out
page II.
[4]
Fit diverter to deck, the distance from the top of
the diverter body to deck must be 1/2" (13mm),
see fig. [3].
Spout, see fig. [4].
Before mortar and tile is applied, wrap exposed parts
with tape to protect threads and opening.
Estimate height of tile level and adjust spout shank
for proper fit, make sure that tape holds up upper
washer and O-ring so that tile can be fitted under-
neath.
[5]
Connect wideset, see figs. [5] and [6].
The spout, side valves and diverter can now be
connected with 3/4" copper tubing.
The hot water supply should be connected on the
left, the cold water supply on the right side.
Water must flow in the direction of the arrows cast
into the body of the side valves and diverter.
Important!
Do not solder the connections between the pipes
and valve body unless all internal parts are
Cold
removed [parts 5, 6, 13 and cap (A)], see fold-out
[6]
page II.
English
2

Publicidad

loading