953971.book : I95397US.FM Seite 3 Mittwoch, Juni 17, 1998 3:22 PM
English
E
D
C
B
K
A
J
H
G
G
M
3
Final Installation
Side valves, see fig. [7] and fold-out page II.
- Screw cartridge (B) into the body, see fig [7].
Left close cartridge should be mounted on the right
(cold) side. Right close cartridge should be moun-
ted on the left (hot) side.
Cartridges are marked with a "L" (left close)
or "R" (right close) on the top edge of the
cartridge.
- Fit extension sleeve (C), escutcheon (D) and
extension spindle (E).
- Push on handle connection set (1), see fold-out
[7]
page II.
- Push on handle or lever.
Diverter, see fig. [8].
- Screw in nipple (G).
- Fit diverter cartridge (H), escutcheon (J) with
cap (A).
- Install diverter handle (K).
Handshower, see fig. [9].
- Fit hose guide (L) to deck.
- Screw shower hose (M) onto handshower (N) and
fit through hose guide (L) from above.
[8]
- Connect shower hose (M) to nipple (G).
N
Flush pipes thoroughly.
M
Open angle stops and check function of faucet.
L
Check connections for leakage.
[9]