Descargar Imprimir esta página

BRÖTJE 663960 Instrucciones De Montaje página 4

Chapa intermedia sgb, sgb 2, sgb c, sgb d

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 10
INSTALLATION
EN
Contents
Intended use
Safety instruction
Installation and adjustment
1.
Remove the boiler front panel
2.
Removing gas burner (see the Installation Manual
of the boiler)
3.
Remove the burner room insulation
5.
Place right edge of the intermediate panel
6.
Slide the intermediate panel from right to left over
the studs (circle) and press down
4
This supplementary sheet describes the installation of intermediate panel for gas
condensing boilers of series SGB, SGB 2, SGB C and SGB D.
The intermediate panel is used for sealing the heat exchanger from exhaust gas es-
caping from cracks in the area of the burner flange.
Note: After installation of the intermediate panel new burner room insulation must
be installed.
Part number Burner room insulation SGB/SGB 2: 663960
Part number Burner room insulation SGB C/SGB D: 663977
Danger of electric shock! Danger to life due to live components!Prior to commenc-
ing any installation work, isolate the boiler from the power supply and safeguard
against unintentional reconnection!
1.
Remove the boiler front panel
2.
Removing the
gas burner
Intermediate panel SGB, SGB 2, SGB C, SGB D
4. Set up heat exchanger if necessary in the crack area
7. Push the intermediate panel to the left (1) and press
down (2), so that it lies completely on the heat ex-
changer.
7312763-01 01.14

Publicidad

loading

Este manual también es adecuado para:

663977