Descargar Imprimir esta página

BRÖTJE 663960 Instrucciones De Montaje página 5

Chapa intermedia sgb, sgb 2, sgb c, sgb d

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 10
8. With a drill Ø = 3 mm drill through the holes in the
intermediate panel into the heat exchanger open-
ing (choose an area in which there is no crack)
7312763-01 01.14
Note: Do not remove the intermediate panel during servicing.
Intermediate panel SGB, SGB 2, SGB C, SGB D
9.
Fasten the intermediate panel with the enclosed
bolts in the previously drilled holes on the heat ex-
changer opening
10.
Attach the new burner room insulation:
Part number SGB/SGB 2: 663960
Part number SGB C/SGB D: 663977
11.
Install gas burner (see the Installation Manual of
the boiler)
12.
Install front panel of the boiler
INSTALLATION
EN
5

Publicidad

loading

Este manual también es adecuado para:

663977