DUAL POWER II
EN
Assembly
Recommendations
• Before starting assembly, please read instructions and
follow them during installation process.
• Use the adequate tools for each operation.
Electricity
• Disconnect ignition key.
• Disconnect battery before starting assembly.
• Make sure electric components are securely connected,
checking their correct fitting.
Piping
• Ensure the refrigerant conduit sleeves are secure
and do not come into contact with sharp or very hot
elements.
• Take particular care when making the boreholes and
cutting, making sure there is no damage to the electric
cables or the fuel conduits.
• All the couplings must be clean, applying a small
amount of the same oil as used for the compressor
before tightening them.
• Always tighten the couplings using 2 wrenches to
prevent any breakage.
Tightening torque (N∙m)
Steel quality
Thread
8.8
M6/100
10
M8/125
22
M10/150
45
Tightening torque (N∙m)
Coupling
3/8
1/2
5/8
Torque
10.9
13
10
30
13
61
17
Nut
Torque
5/8
15-17
3/4
15-17
7/8
24/27
Ø 22, Ø 35 Circular saw
Bore
Ø 4, Ø 7, Ø 9 Broaches
10, 13, 17, 19, 22, 24, 27 Wrench
Scissors
Flexo-meter
Related documentation
Mounting instructions
User's guide
Troubleshooting
Parts list
Warranty
Fragile
Beware of cuts!
Electrical hazard
!
The installing personnel must have a sufficient
training in vehicles air conditioning.
!
Bergstrom shall not be responsible for breakdowns
or damages coming from an inadequate handling or
installation of the equipment or from modifications
and substitutions carried out without our express and
written authorisation.
!
See the product warranty procedure.
!
Please see equipment User's Guide for its correct
functioning of the remote control and control panel.
!
The following should be provided to the user when
installation is complete: User Manual and Warranty.
!
The unit does not comply with ADR regulations.
18
Tools
1002537914
1002625439
1002625438
1002537915
220AA10017
Symbology
! Warnings