DUAL POWER II
PIPING AND CABLE CONNECTION
1- Connect pressure gauges to the circuit.
Vacuum deair for 30 minutes. Introduce the
oil in accordance with the table. Introduce the
gas in accordance with the table.
Total length
of piping
6 m
7 m
8 m
9 m
10 m
11 m
12 m
13 m
14 m
15 m
16 m
17 m
TABLE
C.C. Oil
to be introduced
20 c.c.
35 c.c.
50 c.c.
65 c.c.
80 c.c.
95 c.c.
110 c.c.
120 c.c.
135 c.c.
150 c.c.
165 c.c.
180 c.c.
27
Gas charge
to be introduced
450 grs.
500 grs.
550 grs.
600 grs.
650 grs.
EN