NOTE:
1. 1 Job (Job Nº.1 ~ Job Nº.50) = Sequence (Sequence *50).
2. 1 Sequence (Sequence Nº. 1 ~ Nº. 50) = Tightening Program (TP *1) + Tightening Repeat
(TR Nº.1 ~ TR Nº.99).
3. 1 Tightening Program (TP Nº.1 ~ TP Nº.99) = Tightening Step (TS *5) + Reverse
Parameter.
4. 1 Tightening Step (TS Nº.1 ~ TS Nº. 255) = TS Nº.1 ~ TS Nº.255 could be selected.
5. Tool: always Tool1.
When screws are fastened on 3 sides of a product, the condition is as follows:
JOB
Sequence
First Side
(Sequence 1)
Second Side
(Sequence 2)
Third Side
(Sequence 3)
Set the Seq 1 ~ Seq 3 condition (refer to "Programming the Jobs / Tightening Programs/
steps page" for setting up the parameter condition):
1. Set to Seq 1 when the first side is fastened
Seq 1 condition = Tightening Repeat (TR) 4 screws + Tightening Step (TP) First TP
= 3.0 kgf.cm (Torque)
2. Set to Seq 2 when the first side is fastened
Seq 2 condition = Tightening Repeat (TR) 3 screws + Tightening Step (TP) Second TP
= 2 rotation (Thread), 3.0 kgf.cm (Torque)
3. Set to Seq 3 when the first side is fastened
Seq 3 condition = Tightening Repeat (TR) 2 screws + Tightening Step (TP) Third TP
= 5.0 kgf.cm (Torque)
76
EXAMPLE DESCRIPTION
Tightening
Program (TP)
First TP
Second TP
Second TP
Tightening
Tightening Step (TS)
Repeat (TR)
4 pcs
3 pcs
2 pcs
3.0 kgf.cm (Torque)
2 rotation (Thread)
3.0 kgf.cm (Torque)
5.0 kgf.cm (Torque)