Install Foundation To Floor - Steelcase Mackinac Instrucciones De Montaje

Tabla de contenido

Publicidad

®
Installing the Foundation to the Floor
(for Non-Seismic Applications only)
*For Seismic Applications consult the
SEOR (Structural Engineer of Record)*
WARNING
CRUSH HAZARD! FAILURE TO
PROPERLY SECURE MACKINAC
PRODUCT COULD RESULT IN
PERSONAL INJURY
Read the entire assembly direction
before beginning installation. Obtain
assembly directions at Steelcase.com
Building construction varies greatly. The
SEOR (Structural Engineer of Record) is
responsible for the design of building walls
and floors which Mackinac products are
attached to and must verify the adequacy of
the mounting hardware, even if provided by
Steelcase.
The building owner or designated agent
is responsible for verifying that the
installation is in compliance with all local
codes and regulations.
21.89
1
NOTE: Use 4x fasteners. Each fastener shall
support an upward load of 1,000 lbs
(for Non-Seismic Applications only).
NOTE: Hardware will be determined
by the Structural Engineer of Record.
116mm
+
+
O11.1mm
1
2
Page
1317809001 Rev D

Publicidad

Tabla de contenido
loading

Tabla de contenido