EN
SyMBoL DeScrIPTIoN
Fittings (see page 60)
Assembly (see page 60)
Dimensions (see page 77)
Flow diagram (see page 82)
Note
Points out information to the affected personnel, whose
content is important and must be taken into consideration.
Water connection DN 20
Warm water G 3/4
Water connection DN 20
cold water G 3/4
Turn on water
turn off water
Installation sequence
1.
Requires two persons.
Safety gloves must be worn
Wear gloves while installing the product.
Eye protection must be worn
Silicone (free from acetic acid!)
Decalcifier (citric acid base)
Avoid contact with eyes and skin. If this product contacts your
eyes, rinse thorougly with water.
Sequence power
The performance of the waste must be of sufficient size.
> 50 l/min
6 6
natural sponge
Hot surface!
Warning: Risk of injury to hands
Electricity on / off
Electricity on / off
Electrician
The installation and testing work must be performed by a
skilled electrician in observance of VDe 0100 part 701 and
Iec 60364-7-701.
Spare parts (see page 76)
Maintenance
•
replace sieves (see page 78)
•
replace illuminant (see page 80)
Cleaning (see page 81)
enclosed brochure