Complete Preparation - Dacor DHDU990C/DA Serie Instrucciones Para Instalación

Ocultar thumbs Ver también para DHDU990C/DA Serie:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation

Complete preparation

1.
Determine and make all necessary cuts in the wall
or roof for the vent system. Install the vent system
before installing the hood. See the "Venting Methods"
section.
2. Determine the location where the power supply cable
will be run through the wall.
3. Drill a 1" (2.5 cm) hole at this location.
4. Pull enough power supply cable through the wall to
allow for easy connection to the terminal box.
5. Remove the terminal box cover and set aside.
A. Terminal box cover
B. Knockout
C. Power supply wire connector
Single fan model
C
Double fan model
C
6. For all hood models install the 10" (25.4 cm) round
vent transition with damper to the top of the hood
(depending on your installation), using 4- 3.5 x 9.5
mm screws.
7.
Remove the knockout from the back of the hood and
install a UL listed or CSA approved ¹⁄₂" (1.3 cm) strain
relief.
A. 4 - 3.5 x 9.5 mm screws
B
B. Knockout
C. Mounting screws slot
D. 4 - 4.2 x 19 mm screws slots
E. 2 - 6 x 80 mm screws slots
A
NOTE
The exhaust adaptor/damper can be installed up to 1
inch on either side of the hood center to accomodate
off-center ductwork.
In extreme off-center installations, one end of the
duct connector may need to be trimmed to clear the
electrical cable clamp.
8. Place the hood near its mounting position and run the
power supply cable through the strain relief into the
B
terminal box (enough to make connection).
9. Tighten the strain relief screws.
10. Make the electrical connection. See the "Electrical
connection" section (p.18).
A
All hood models
A
D
B
A
D
C
E
ENGLISH
15

Publicidad

Tabla de contenido
loading

Tabla de contenido