DE
EN
Preparing the water supply and starting the sprinkling
process
Now connect the available water supply with the LEADER (fig. 9).
Tip: The diameter of the supply hose should always be one hose
size larger than the hose on the reel irrigator (see technical data,
chapter. 3).
The sprinkling process starts and the sprinkler trolley is pulled in
by the hose.
Water pressure: min. 3bar - max. 5,5bar
The speed of the sprinkler may be adjusted continuously. A swivel
valve (fig. 10) is located on the water turbine for this purpose:
Turn off valve = slower = intensive sprinkling
Open valve = quicker = reduced sprinkling
The circular movement of the sector sprinkler can be adjusted as
required. The spray jet can be "interrupted" as required using the
adjusting screw (see chapter: Setting the sector sprinkler).
When the sprinkling is completed, the sprinkler trolley activates the
automatic shut-off by pushing the activation handle on the front of
the hose reel upwards (fig. 11).
This closes the valve and the water supply is interrupted.
Sprinkling is now terminated.
FR
ES
IT
fig. 9
fig. 10
fig. 11
15