Salicru EQUINOX EQX2 2001-S Manual De Usuario página 67

Ocultar thumbs Ver también para EQUINOX EQX2 2001-S:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

8.4.3.2. Configuring the installation on the app.
The inverter must be powered through the solar field at all times throughout the entire process.
Click on the plant that has been created to access its details:
For the time being, only the power of the solar
field that has been entered will be displayed
because the measurement instruments are not yet
connected; this will be shown with the "Devices
offline" message on the top of the synoptic chart.
The ESM1 EQX network analyser is already
physically connected to the 485/WiFi 24H EQX
communication module, so it will only be necessary to
link the latter.
Add a  device to the plant that has been created: press the
"properties" button [ ], to the right of the plant title.
USER MANUAL
EQX2 SOLAR INVERTERS CONNECTED TO THE GRID
67

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Equinox eqx2 3001-sEquinox eqx2 3002-sEquinox eqx2 3002-sxEquinox eqx2 4002-sEquinox eqx2 4002-sxEquinox eqx2 5002-s ... Mostrar todo

Tabla de contenido