Transport And Unpacking - Samoa 391 001.270 Guía De Servicio Técnico Y Recambio

Inductor de doble poste para bidones de 185 kg. power ram
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

TRANSPORT AND UNPACKING

The packed parts should be handled as indicated in the symbols and
markings on the outside of the packing.
Before installing the equipment, ensure that the area to be used is large
enough for such purposes, is properly lit and has a clean, smooth floor
surface.
The user is responsible for the operations of unloading and handling and
should use the maximum care so as not to damage the individual parts
or injure anyone. To perform the unloading operation, use only qualified
and trained personnel (truck and crane operators, etc.) and also suitable
The disposal of packaging materials is a customer's
competence and must be performed in accordance with
the regulations in force in the country where the plant is
installed and used. It is nevertheless sound practice to
recycle packaging materials in an environment-friendly
manner as much as possible.
INSTALLATION
!
Secure firmly the base to the concrete floor using anchor bolts (not included in the supply).
!
If the unit is not installed correctly this can result in serious injury or material damage. Read the warnings.
(See warnings and precautions).
This unit comes completely assembled, apart from the following details
for proper installation and commissioning.
The unit is supplied with the control cabinet in the transport position. Only
for lateral panel (To place the control panel in the working position, may
be necessary disconnect pipes A and B from the control panel (Fig. 5).
Remove the pin from the hole locking the control panel, see upper
arrows). Lower the control panel into its new working position (see
arrow for rotational direction). Once the control panel is in place, insert
the pin making sure the holes of the new position coincide. This will lock
Once the definitive location of the unit has been defined, pay special
attention to the work area that will be above the inductor; this work area
shall be free of objects and any electrical devices. Once you have finished
the above step, secure the unit definitively. The base plate itself can be
used as a pattern to establish the correct fixing locations.
Connect pipes to the pneumatic control panel according to the details
in the drawing (Fig. 5).
Connect F to main air supply.
Connect G to pump air inlet.
Only for model 544913.770:
Connect H to air pump main line.
Connect I to on/off external signal pump.
The unit is tested and verified in the factory but it is a good idea to check
it at its destination. Connect it to a compressed air inlet with a maximum
pressure of 10 bar and check that all the accessories of the pneumatic
system are in good condition after transport. The control cabinet
enables you to regulate the pneumatic actuator for raising and lowering
the cylinders independently and to regulate the pump pressure.
SAMOA Industrial, S.A. · Pol. Ind. Porceyo, I-14 · Camino del Fontán, 831 · 33392 - Gijón - Spain · Tel.: +34 985 381 488 · www.samoaindustrial.com
hoisting equipment for the weight of the installation or its parts. Follow
carefully all the safety rules. The personnel must be equipped with the
necessary safety clothing.
The manufacturer will not be responsible for the unloading operations
and transport to the workplace of the machine.
Check the packing is undamaged on receipt of the equipment. Unpack
the machine and verify if there has been any damage due to
transportation. In case of damage, call immediately SAMOA and the
Shipping Agent.
it in the working position. Then connect the pipes in the lower part of
the control panel according to the diagram (see Fig. 5).
To facilitate its handling, the unit is supplied with a pallet system
integrated in the design. This system is composed of two galvanised
sheet metal profiles bolted to the base plate. Once you have selected
where you will secure the unit, it is necessary to remove these profiles;
to do this, loosen and remove the screws that secure them and then
remove the profiles in the direction of the arrows. Take care when doing
so to avoid possible accidents.
To extend the life of the unit and the pump, use a filter at the control
panel input.
The control panels are regulated in the factory to an approximate
pressure of 5 bar for the pneumatic actuator and 5 bar for the
pneumatic pump.
To finish the installation process, is necessary adjust the height of the
drum empty shut off valve (1), which protect the pump from dry
running and activate the drum empty alarm.
To adjust the valve (1), place one empty drum on unit or take the
measure to bottom of the drum. Fix the valve (1) to support plate (2),
just when the roller (3) is starting to be pressed and the follower plate is
reaching the bottom drum.
Use the flow regulator (4) to adjust the sound level in the alarm, or annul
it. Use protection to manipulate the alarm indoors.
EN
3
R. 05/21 854 803

Publicidad

Tabla de contenido
loading

Tabla de contenido