Checking The Installation - Thermo King C Serie Manual De Instalación

Tabla de contenido

Publicidad

All holes should be sealed with silicone or foam.
Check with a sheet of paper that the fans blow in the right direction.
The drain circuit should be on an incline and the moisture trap should be installed.
Position the hole at the expansion valve.
The temperature sensor should be connected.
The in-cab control box should be located in such a way that it is accessible and visible
from the driver's seat.
The contact draw should be made.
Hoses should not be taut (they should be able to absorb vibrations and be shortened
in case of leaks).
(Rev. 3, 05/11)

CHECKING THE INSTALLATION

Hoses should not rub against moving parts, sharp parts, or parts that can reach high
temperatures.
The oil return should be connected.
The compressor should be primed with oil.
The unit should be connected to the battery.
The drive kit test should have been carried out.
The seal test should have been carried out.
Eng
46

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

C-100C-200C-300

Tabla de contenido