Step 11
Step 12
Step 13
Turn the pressure
release knob a
quarter of a turn
anti-clockwise to
Step 14
release the
pressure.
Slowly operate the
priming pump until
there are no air
bubbles visible in
the reservoir.
Note: It should
take 10-15
Step 15
strokes to remove
trapped air from
the system.
CAUTION
Do
not operate the
pump when no
air bubbles are
visible in the
reservoir.
Remove the
blanking plug from
the test port.
CAUTION
Do
not remove the
blanking plug
Step 16
when the
instrument is
under pressure.
Before removing
the blanking
plug, check the
instrument
pressure display
for pressure. If
pressure is
observed, turn
the pressure
release knob
fully anti-
Step 17
clockwise until
the pressure
display reads
zero (gauge
sensor) or
atmospheric
pressure
(absolute
sensor).
Turn the pressure
release knob fully
clockwise, hand
tight.
Turn the volume
adjuster wheel 2-5
turns clockwise to
remove any trapped
air.
Note: The user
may notice air
bubbles at the
opening of the
test port.
CAUTION
not operate the
priming pump.
Secure the device
under test and
connect the device
under test to the test
port by turning the
connector anti-
clockwise.
Note: Use
adapters provided
with the
instrument or an
AMC adapter(s)
and the
corresponding
seal(s).
Secure the device
under test.
Use the priming
pump to prime the
system to a
maximum of 10-20
bar.
Copyright 2022 Baker Hughes Company.
English–DPI 610E Quick Start & Safety Manual | 7
Do