3.5 - Installing the
heater
Recommended tool
Assembly template
Assembly
B
C
A
A Cordless screwdriver or electric drill
B Cutter knife or Stanley knife
C Pencil or ballpoint pen
D Hammer
E Spanner with 8 mm WAF (open-end or ring)
F Spanner with 10 mm WAF (open-end or ring)
G 8 mm drill suitable for the material of your wall / ceiling
• Use the accompanying assembly template to determine the position
of the drilling holes for product installation to the wall / ceiling.
Always pay attention to the requirements for the installation site and
the necessary minimum distances (see Page 10).
• We recommend using a spirit level when mounting onto a wall
to ensure a vertical mounting position.
1 First drill the required holes at the previously marked positions
using an 8 mm drill suitable for the material of your wall or ceiling.
- Drill 4 holes for heaters up to max. 1,200 mm in length.
- Drill 6 holes for heaters from 1,500 mm in length.
The accompanying drilling template will also specify the number of
holes. Please ensure correct positioning of the drilling
holes for optimum mounting of the wall bracket (V-brackets) to be
screwed on later.
Use (if suitable for the material of your wall /
ceiling) the supplied dowels, lag bolts and washers
from the "Standard fi xing set" supplied with the heater -
as shown on the left.
2 Insert the dowels into the holes (drive in with a hammer if necessary)
and screw in the screws with washers using a 10 mm spanner. Do not
completely tighten the screws. Make sure there is 4 mm of space be
tween the washer and the wall / ceiling.
8 mm
E
F
8 mm
G
D
10 mm
31