Kohler K-78476H-0 Guía De Instalación Y Cuidado página 7

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 69
Installation
1
Position the template on the floor to
ensure the template against the wall.
Tape in place and drill holes.
Draw centerline
on the floor.
3
Thread the supply hose onto fill valve.
Kohler Co.
2
Position the brackets as shown on the
template and install the brackets.
mm
10
4
Position the gasket over the flush valve
nut.
7
1290970-GL2-B

Publicidad

Tabla de contenido
loading

Tabla de contenido