Stanley JL-103 Manual De Instrucciones página 4

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

INITIAL TESTING:
It is normal for the switch to take several minutes
to turn off when first installed. To run a "turn on"
test during daylight, cover the sensor eye with an
opaque material. The test should take approximately
two minutes.
TECHNICAL DATA:
Switch:
Rated Voltage:
Rated Frequency:
Rated Load:
Action Time
Power Consumption:
Operational Level:
Operational Temperature Range:
Operational Humidity Range:
Electrical Life:
Lead Length:
SPST NO
120VAC
50/60Hz
1800W Tungsten
1100VA Ballast
20-120s
1W
10~20Lx On (dusk)
30~60Lx Off (dawn)
-40°C – 70°C
-40°F – 158°F
95% RH
6500 cycles
180mm

Publicidad

Tabla de contenido
loading

Tabla de contenido