St ep 3: Inst all t he panel
Align the front panel to the main body, taking
into account the position of the piping and
drain sides. Hang the four latches of the
decorative panel to the hooks of the indoor
unit. Tighten the panel hook screws evenly at
the four corners.
NOTE: Tighten the screws until the thickness
of the sponge between the main body and the
panel reduces to 4-6mm (0.2-0.3"). The edge of
the panel should be in contact with the ceiling
well.
Adjust the panel by turning it to the arrowed
direction so that the ceiling opening is
completely covered.
Drainage interface
louver motor
Main body
Ceiling
Panel side sponge
Panel
Panel foam 1
Piping interface
Into the wind
Outlet foam
Ba e
Out of the wind
NOTE: If the height of the indoor unit needs
to be adjusted, you can do so through the
openings at the panel' s four corners. Make
sure that the internal wiring and drainpipe
are not a ected by this adjustment.
CAUTION
Failure to tighten screws can cause water
leakage.
Gap not allowed
CAUTION
If the unit is not hung correctly and a gap exists,
the unit' s height must be adjusted to ensure
proper function. The unit' s height can be
adjusted by loosening the upper nut, and
adjusting the lower nut.
Panel foam 2
95
Water condensation
1
Loosen upper nut
2 Adjust lower nut