Installing The Appliance - Zodiac Z350iQ Guia De Inicio Rapido

Ocultar thumbs Ver también para Z350iQ:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 35
1

Installing the appliance

Rotate the top and user interface
CAUTION : The display board (under
the display screen) is connected by a
cable to the control board inside the unit.
Handle the top cover carefully to do not
damage this cable.
x 4
User
interface
Choose the location
that are best fitting the installation configuration
Wall
15cm
Hydraulic connections
Evacuate the condensates
4
if needed
Top
cover
and the hydraulic connectors
Wall
50cm
50cm
Evaporator
Fit a Ø18 pipe on the grooved elbow to be mounted under the appliance base.
50cm
User interface
Refer to the online manual for
further details about installation
precautions and hydraulic
connections.
Installation
Ø50
+
Wall
50 cm
50cm

Publicidad

Tabla de contenido
loading

Tabla de contenido