red / rouge /
rojo
2
2 mm
6
2
1
1
English
Installation
To insure correct operation of
the faucet, install the hot valve
on the left and the cold valve
on the right.
Push the valves up into the holes.
Install the mounting nuts on the valves.
Rest the valves on the mounting surface.
Tighten the tensioning screws.
Place the handles over the valve mounting nuts.
Tighten the handles by rotating the escutcheons
clockwise.
If necessary, tighten the spout screw.