6.
Install the next 5 infill boards. Install the top 2
screws in the U-channel (Fig 7).
7.
Install the upper set of U-channels flush with the
lowered post and centered in the post. Using the
holes in the post channel as a guide, pre-drill the
post using a
the channel (Fig 8). Repeat for the other side.
8.
Install the next 2 infill boards. Screw the channel
through the infill (Fig 9). Repeat for other side.
⁄
" drill bit. Install 3 screws to attach
1
8
Fig. 7
Fig. 8
Fig. 9
5