Release the safety latches (3) to install the distillation process components.
Connect the distillate extraction core (8) to the condensing cooling tower (4)
by mounting the former on the outlet.
Tighten the cooling water outlet core (5). Place the gasket (15) in the core stub
(5-EE). Attach the assembly aligned with the cooling tower outlet (4-EE). Tighten the
connection well.
Connect the outlet silicone hose to the cooling water inlet (7). Secure the
connection with a clip (CC).
Attach the steam condensing core (6) to the kettle lid receptacle (BB). Release
the attachment to facilitate this step. Pass the core stub through the kettle lid