Descargar Imprimir esta página

ROBLIN IKOS Serie Manual De Instrucciones página 11

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 27
- 4 metres with 1 x 0 bend.
- 3 metres with 2 x 0 bends.
- 2 metres with 3 x 0 bends.
The above assumes our 150 mm (6 INS) ducting is being installed. Please note ducting components and
ducting kits are optional accessories and have to be ordered, they are not automatically supplied
with the chimney hood.
IN THE E TRACTI N
Place he ducting 150mm (6 INS) over the round outlet
connections with appropriate clamping rings or adhesive tape (
Remove the grease lters (see paragraph
cable is correctly inserted in the socket placed on the side of the fan. Before tting the chimney to
the canopy make the electrical connection as described in the section titled ELECTRICAL.
electrical connection has been made, test the lights and the fan motor.
Upper chimney stack
Slightly widen the two sides of the upper chimney stack (
brackets
making sure that they are well seated.
Secure the sides to the upper bracket using the 2 screws
d. Lower chimney stack
Slightly widen the two sides of the chimney stack (
chimey stack and the wall, making sure that they are well seated.
IN THE RECIRCULATI N
. Fit the recirculation spigot R
the chimney outlets.
. Connect the ducting 150mm (6 INS) not provided between motors
and secure the connections with appropriate clamping rings or adhesive tape.
. Remove the grease lters (see paragraph
feeding cable is correctly inserted in the socket placed on the side of the fan. Before tting the
chimney to the canopy make the electrical connection as described in the section titled
ELECTRICAL.
hen
the electrical connection has been made, test the lights and the fan motor.
. Remove the metal grease lters and insert the charcoal lter into the base of the motor housing
and secure the lter with two metal securing straps
. Upper chimney stack
Slightly widen the two sides of the upper chimney stack (
brackets
making sure that they are well seated.
Secure the sides to the upper bracket using the 2 screws
f. Lower chimney stack
Slightly widen the two sides of the chimney stack (
chimey stack and the wall, making sure that they are well seated.
E:
aintenance) being sure that the connector of the mains
E:
ake sure that the outlet is horizontally and vertically aligned with
aintenance) being sure that the connector of the
on top of the canopy and secure the
).
I
) and hook them behind the
(2, x ,5) supplied.
I
) and hook them between the upper
and the recirculation spigot
A as illustrated in
4.
I
) and hook them behind the
(2, x ,5) supplied.
I
) and hook them between the upper
B
hen the

Publicidad

loading