Descargar Imprimir esta página

Grohe Talia 24 667 Instalación página 6

Ocultar thumbs Ver también para Talia 24 667:

Publicidad

Idiomas disponibles

Idiomas disponibles

954251.book : I95425us.fm Seite 3 Montag, November 23, 1998 10:28 AM
English
J1
R
P
N
L
V
T
S1
U
S
3
Diverter
K
1.Insert diverter body with seals (J) and nut (I)
J2
through the basin hole from below, see fig. [6].
2.Slide on seal (J1 or J2) and screw on nut (K) until it
is at the same height as the top of the diverter
body, see fig. [7].
3.Secure diverter body to the basin by tightening
J
nut (I), see fig. [6].
I
4.Screw on escutcheon (L), see fig. [8].
5.Press on snap insert (N) and secure with
[6]
screw (P).
6.Push on handle (R).
Verticle spray
1.Insert body with seals (S) from below,
see fig. [9].
2.Slide on seals (S1) and secure with nut (T).
3.Jet-height can be decreased by turning the
nozzle (U) to the left, turning to the right in-
[7]
creases jet-height.
4.Screw on spray face plate (V).
Fit pop-up drain, see fold-out page II item 13,
ensure that flange of pop-up drain is sealed.
Flush pipes thoroughly.
Connect wideset, see fold-out page I.
- For this purpose the supply tubes must be con-
nected to the angle stops (or other supply points).
- The hot water supply should be connected on the
left, the cold water supply on the right side.
[8]
- Connect both side valves to the connection tee via
the flexible hoses.
- Connect the flexible hose from the vacuum
breaker to the diverter.
- Connect the verticle spray to the bottom of the
diverter.
Open angle stops and check function of faucet.
Check connections for leakage.
[9]

Publicidad

loading