Descargar Imprimir esta página

BEGLEC JB Systems Light DSP-12 Manual De Instrucciones página 5

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 23
ENGLISH
CONNECTIONS
(Mains inputs/outputs)
This unit may only be installed by qualified personal, following the
rules for electrical installations in your country! After installation
always put the metal covers back in place and make sure to use
proper cable entry glands (see picture) to protect the wires from
unwanted traction and friction.
• SINGLE PHASE INSTALLATION (2 wires "L"+"N"+ earth wire "E"):
• Since you have only 1 phase wire (L) you must make bridges between the
L1/L2/L3 inputs and connect the phase wire to these inputs.
• Connect the neutral (N) to the N-input.
• Connect the outputs between each channel output and the neutral wire (N).
• Don't forget to connect the earth connection properly!
• THREE PHASE INSTALLATION (4wires "L1+L2+L3+N" + earth wire "E"):
• Since you have 3 phase wires you can connect these directly to the corresponding
L1/L2/L3 inputs. (see drawing)
• Connect the neutral (N) to the N-input. (see drawing)
• Connect the outputs between each channel output and the neutral wire (N).
• Don't forget to connect the earth connection properly!
JB SYSTEMS®
OPERATION MANUAL
5/60
DSP12
ENGLISH
SETUP MENUS
Please refer to the overview below to fully understand the menu structure of the
DSP12:
You can clearly see which buttons to push to select a certain function. In most cases
the DSP12 is in normal working condition (display shows channel output condition).
Push the "menu" button to enter the setup menus. With the "up/down" buttons you can
scroll through the 6 available menus. With the "esc" button you can go one step back
in the menu. After +/-30sec the DSP12 returns automatically to the normal working
mode.
In the next chapter you can read more about each function.
JB SYSTEMS®
OPERATION MANUAL
6/60
DSP12

Publicidad

loading