By PUMA 1HP and 1/2HP compressor, LEONARDO 1HP compressor, AIRCRAFT 1HP compres-
13. BEVERAGE CONNECTIONS
13.1 Beverage input for model: SOUDEK 20 Green Line new
Beverage input is located on the right side from the bottom of the device.
13.2 Beverage input for model: SOUDEK 50 Green Line new, SOUDEK 35 Green Line new
Beverage input is located at the back of the cooler.
13.3 Beverage input for model: PYGMY 25/K Exclusive Green Line 1x kohout new, PYGMY 25/K
Exclusive Green Line 2x kohout new
Beverage input is located at the back of the cooler.
14. POSITIONING OF THE THERMOSTAT
14.1 Positioning of the thermostat: SOUDEK 20 Green Line new
Mechanical thermostat is located under the wooden cap on the back of the cooler.
14.2 Positioning of the thermostat: SOUDEK 50 Green Line new, SOUDEK 35 Green Line new
Mechanical thermostat is located below the tap and a wooden cap on the front of the cooler.
20
14.3 Positioning of the thermostat: PYGMY 25/K Exclusive Green Line 1x kohout new, PYGMY
25/K Exclusive Green Line 2x kohout new
Mechanical thermostat with a numeric scale of 1-7 based on the back of the cooler.
If everything is in order, check the thermostat settings (in off position). Connect the cooler to
the power mains. Then use the keg coupler to tap the keg, set the desired pressure (1.0-3.4 bar)
and use the tap lever to pour out some of the beverage. If the cooler contains remnants of sani-
tation solution or water, keep the tap lever in open position until only beverage pours out of the
15. HOW TO WORK WITH SPEED FITTINGS
15.1 Speed Fitting Installation
Grasp the speed fitting and insert the hose all the way inside the speed fitting body (ca. 20 mm).
The end of the hose must be straight so that it plugs fully into the coupling. If the hose will not go
in, moisten the end of the hose.
Other Pressurisation Options
sor, classic Biogon, N2 bottles.
(see Fig. 13.)
tap. Set the desired beverage temperature on the thermostat.
:
:
(see Fig. 14.)
:
(see Fig. 15.)