Descargar Imprimir esta página

STAR Water Systems POWERFLUSH OPTIMA PRO S2004 Manual De Instrucciones página 12

Publicidad

Idiomas disponibles

Idiomas disponibles

ROUGH-IN - EXPOSED PUMP UNIT INSTALLATION
1. Position the grinder/tank unit a minimum of 1/8-in from
the wall with the inlet facing forward. Attach the rubber
coupling to the inlet using the worm drive clamp provided.
2. Place the toilet in front of grinder/tank unit; aligning the
discharge of the toilet with the inlet of the grinder/tank unit.
Check to be sure that the rubber coupling will bridge the
gap adequately for final installation. The toilet tank should
be a minimum of 1/2-in. from the wall.
CAUTION: Do not connect rubber coupling to toilet at this
time.
3. Lightly mark the locations of the grinder/tank unit, toilet
and closet screw set locations on the floor.
1
2
3
Grinder/tank unit location
Toilet
Location
12
Wall
1/8 in.
Minimum
Rubber
Coupling
Clamp
Inlet
Wall
1/2 in. Minimum
Grinder
Unit
Inlet
Toilet Discharge
Closet
Screw Set
Locations
IL1751

Publicidad

loading

Productos relacionados para STAR Water Systems POWERFLUSH OPTIMA PRO S2004

Este manual también es adecuado para:

Powerflush optima pro s2006