TOILET INSTALLATION (CONTINUED)
2. Place the toilet assembly over the closet screw sets.
Install the anchoring hardware and tighten in an
alternating pattern. Check for level and shim as required.
Be careful when tightening bolts or nuts against china to
avoid cracking the china.
3. For exposed installation, Install rubber coupling onto the
toilet discharge and grinder/tank unit hub and secure
with the worm clamps provided .
4. For hidden installation, (using optional extension kit
023260) install the rubber couplings to both the grinder/
tank unit and the toilet discharge and secure to extension
pipe with worm clamps provided.
2
3
4
Grinder/tank
unit
16
Closet Screw Sets
Sched 40
PVC Pipe
Couplings
Clamps