Descargar Imprimir esta página

LG ESS Home 10 Manual De Instalación página 18

Sistema de almacenamiento de energía
Ocultar thumbs Ver también para ESS Home 10:

Publicidad

Idiomas disponibles

Idiomas disponibles

18
Installation
Minimum Clearance
This product must be installed with clearance at the left, right, top, bottom and front of the product
as shown in the figure.
Be sure not to block right side of the installed PCS. Risk of serious injury due to high temperature.
HB Battery (single and dual)
Only the battery can be installed at the bottom clearance space of the product. If you install the
2
battery unit at the bottom clearance space, leave the clearance space between the battery and the
product more than 300 mm.
3 0 0 m m
3 0 0 m m
3 0 0 m m
3 0 0 m m
3 0 0 m m
3 0 0 m m
1 6 0 0 m
m
Dual batteries
Single battery
HBP/HBC Battery (Single and Dual)
5 0 0 m m
5 0 0 m m
3 0 0 m m
3 0 0 m m
3 0 0 m m
3 0 0 m m
B A T . 2
1 6 0 0 m
m
B A T . 1
Dual batteries
Single battery

Publicidad

loading

Este manual también es adecuado para:

Ess home 8D010ke1n211D008ke1n211