QUICK START GUIDE
Please read the safety manual fully before turning
on and using your grinder.
1
5
Select grind size
4
6
7
by twisting the
grind dial to
the left or right
(1=fine, 11=coarse).
4
5
4
Ensure the
magnetically aligned
catch is fully beneath
the chute.
4
Remove lid from the
single dose load bin
by lifting it off.
8
9
10
11
Pour the desired
quantity of roasted
whole coffee beans
into the load bin.
6
7
8
Press power button.
9
The grinder will
10
11
start grinding and stop
automatically a few
seconds after your
beans are done grinding.
6
2
Before retrieving
the catch, eject excess
coffee grinds from inside
the chute by flicking the
metal grinds knocker.
3
8
5
Transfer grinds into your
desired coffee maker
using the easy pour
fins inside the catch.
5
4
6
7
Remove the catch
8
9
from beneath the
10
11
grinder and
take off lid.
For more instructions,
see the Safety and
Maintenance guide.
7
5