Operation Test; Drainage Way - INVENTOR COOL FCOOL-8BS Manual De Usuario

Ocultar thumbs Ver también para COOL FCOOL-8BS:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 158

Operation test

● Plug in the power cord, then press ON/OFF on the remote controller to initiate use.
● Press the MODE button to select between AUTO, COOL, DRY, FAN or HEAT (In some models
only) and check for normal operation.
● Note: If the temperature within the area of operation, is below 16°C, this unit can not operate
under cooling mode.

Drainage way

In COOL or DRY operation, the condense water is drained to the main body, as the temperature of
the condenser is high, most of the condensed water will be evaporated. Usually only a minimum
amount of accumulated water would need to be drained.
When the main body of the air conditioner is full of water, the unit will beeb 8 times indicating "H8"
on the display panel, to alert that drainage is necessary.:
● Move unit to a suitable area for draining, while moving do not tilt the unit and always keep in an
upright position;
● Remove the drainage pipe from the plastic holder take off the rubber plug, and drain the water;
● When completed, reposition the rubber plug onto the drainage pipe and place the pipe on its
plastic holder;
● Once this procedure is completed the FULL WATER indication will turn off, and the unit will
resume operation.
Note: Allow the compressor around 3 minutes to regain operation.
22

Publicidad

Tabla de contenido
loading

Tabla de contenido