Descargar Imprimir esta página

Atlas Copco LLA250 ATEX Instrucciones Del Producto página 20

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 81
Service
Load chain
Our recommendation is to check the chain before each shift regarding wear. Lu-
bricate the chain at least once a month and after every 500 lifts. Make sure to
lubricate the chain when unloaded. The chain links that run most frequently
over the chain wheel inside the hoist will be worn first. Be especially observant
of these links.
• Be specifically observant of a wear pattern according to the illustration be-
low. If this occurs on any of the chain links, the chain needs to be changed
immediately.
• Make sure that the load chain wear, at any part of the chain, does not ex-
ceed , measured inside over seven well stretched links.
• Whenever the load chain is changed, the chain wheel should also be
cleaned, inspected for wear and then lubricated.
Lubrication instructions
Grease guide - Air hoists LLA
Brand
BP
Esso
Q8
Mobil
Shell
Atlas Copco
Brand
Mobil
20
Bearings
Bearings
Mobil SHC Polyrex 005
© Atlas Copco Industrial Technique AB - 9836 9833 00
EN
Gears
4210 2255 00
Gears
Mobil SHC Polyrex 005
LLA250 ATEX
Air lubrication
Energol E46
Arox EP46
Chopin 46
Almo Oil 525
Torcula 32
Air lubrication
Mobil SHC Cibus 32

Publicidad

loading

Este manual también es adecuado para:

8451154010