Attention, ALWAYS install the motor parallel to the door guide rails!
Raise the motor and align the roof bracket (1). It should be placed within
area B (between 0 and 600 mm from the control box unit).
Make sure the ladder you are using is always in good condition!
1. Horizontally align the opener from the midpoint of the gate to the rear
side (HM). Mark the places where you will drill the holes.
Wear safety glasses when drilling! Make sure the walls are wide enough!
2. Drill two 10mm diameter x 65mm deep holes.
3. Insert the plug (1), then insert two screws (2) with their flat washers (3).
Tighten the screws.
4. Align the track (4) to its correct height. If necessary, move the screws
(5). Once aligned, tighten the screws (5).
ATIZA 1000N