Descargar Imprimir esta página

Boso Bosch+Sohn medicus family 4 Manual Del Usuario página 81

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

Calibration checks - Testing instructions
(for trained specialist staff only)
Testing
1.) Remove batteries.
2.) Hold start button pressed down and
insert batteries.
3.) Release start button.
The monitor is now ready for testing;
the current pressure is displayed in the
SYS and DIA fields.
4.) Perform test for deviation of pressure
display and pressure circuit integrity
(observe setting time for cuff – at least
30 seconds) in the usual manner.
5.) Switch off monitor by pressing the
START button again.
m
The device must not undergo service
or maintenance while it is in use.
EN
81

Publicidad

loading

Productos relacionados para Boso Bosch+Sohn medicus family 4