Descargar Imprimir esta página

HOMCOM A90-196 Instrucciones De Montaje página 29

Ocultar thumbs Ver también para A90-196:

Publicidad

Idiomas disponibles

Idiomas disponibles

Tighten nut onto screw with included
wrench. Repeat on other side.
Place the nuts and washers to the side for
now.
The rollers help to move the bike when it is tilted forward and should not touch the floor
when the bike is in a regular standing position. When properly installed, the rollers will face
outward from the front of the bike (see images). If the rollers touch the floor, uninstall the
foot, turn around, and reinstall.
Place the washer onto screw.
Take both nuts and washers off of front
foot with rollers.
Install front foot onto front main frame leg.
Screw on the nut.

Publicidad

loading