Descargar Imprimir esta página

Panasonic CS-Z20VKEW Manual De Instrucciones página 15

Ocultar thumbs Ver también para CS-Z20VKEW:

Publicidad

Idiomas disponibles

Idiomas disponibles

9. Charging procedures
• In addition to conventional
charging procedures, the following
requirements shall be followed.
-Ensure that contamination of
different refrigerants does not occur
when using charging equipment.
-Hoses or lines shall be as short as
possible to minimize the amount of
refrigerant contained in them.
-Cylinders shall be kept in an
appropriate position according to
the instructions.
-Ensure that the refrigerating system
is earthed prior to charging the
system with refrigerant.
-Label the system when charging is
complete (if not already).
-Extreme care shall be taken not to
over fi ll the refrigerating system.
• Prior to recharging the system it shall
be pressure tested with OFN (refer
to #7).
• The system shall be leak tested on
completion of charging but prior to
commissioning.
• A follow up leak test shall be carried
out prior to leaving the site.
• Electrostatic charge may accumulate
and create a hazardous condition
when charging and discharging the
refrigerant.To avoid fi re or explosion,
dissipate static electricity during
transfer by grounding and bonding
containers and equipment before
charging/discharging.
10. Decommissioning
• Before carrying out this procedure,
it is essential that the technician
is completely familiar with the
equipment and all its details.
• It is recommended good practice that
all refrigerants are recovered safely.
• Prior to the task being carried
out, an oil and refrigerant sample
shall be taken in case analysis is
required prior to re-use of recovered
refrigerant.
• It is essential that electrical power
is available before the task is
commenced.
a) Become familiar with the
equipment and its operation.
b) Isolate system electrically.
c) Before attempting the procedure
ensure that:
• mechanical handling equipment is
available, if required, for handling
refrigerant cylinders;
• all personal protective equipment
is available and being used
correctly;
• the recovery process is supervised
at all times by a competent person;
• recovery equipment and cylinders
conform to the appropriate
standards.
d) Pump down refrigerant system, if
possible.
e) If a vacuum is not possible, make
a manifold so that refrigerant can
be removed from various parts of
the system.
f) Make sure that cylinder is situated
on the scales before recovery
takes place.
g) Start the recovery machine and
operate in accordance with
instructions.
h) Do not over fi ll cylinders. (No more
than 80 % volume liquid charge).
15

Publicidad

loading