Descargar Imprimir esta página

Kohler K-7309 Guia De Instalacion página 3

Ocultar thumbs Ver también para K-7309:

Publicidad

Idiomas disponibles

Idiomas disponibles

Flange
1. Install the Supply Stops
NOTE: Ensure that one flange is threaded onto each cold and hot
supply stop.
Apply thread sealant onto the exposed threads of each cold and
hot 1/2" NPT supply pipe.
Slide one supply stop assembly onto each cold and hot 1/2" NPT
supply pipe.
Thread each cold and hot supply stop assembly until the flange is
snug against the sink or finished wall.
Kohler Co.
1/2" N.P.T.
Supplies
8" (20.3 cm)
on Center
Stop
3
113700-2-AB

Publicidad

loading