Installation
2. Connect the hot & cold supply pipes as shown.
IMPORTANT NOTE:
• The product is fitted with a blanking cover (B), a pressure of 5 BAR should not be
exceeded with this fitted
• Do not leave the valve pressurised for prolonged period with the blanking cover
assembled