Descargar Imprimir esta página

Pahlen LED 350 50VS Manual página 17

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

Spotlight LED 350 50VS
Concrete
Consult your concrete/finishing supplier of any liners and method of application.
Junction box
Item no. 12310
Cable tube
Item no. 12330
Install as below:
1. Connect the earth cable (min. 6mm
Use the supplied grounding kit with a screw, ring terminal and tag plate.
2. F ix the inlet pipe, mask the flange (its surface should be under the packing).
Stones: The flange should rest on the finished pool wall (see fig. A on the prev. page).
Insulating block: The flange should rest on the pool wall plastered finish (see fig. B on the prev. page).
Concrete: The flange should rest on the pool wall plastered finish (see fig. C on the prev. page).
NOTE! The minimum distance between non-corrosive and corrosive materials shall be 50 mm.
Recommended mounting depth, see drawing.
3. Cast the pool frame as instructed by the supplier.
4. Fix the self-adhesive packing onto the flange.
5. Fit the plug in the rear of the injection pipe. When the o-ring is used, no other gasket is required.
6. Fit the cable grommet (or cable pipe art. no.12330) into the plug. Use the supplied o-ring and
ensure that it fits right. No additional seal is required.
7. Fit the pool liner according to the supplier's instructions and begin filling with water.
8. When water reaches approximately 5 cm below the injection pipe, cut a small cross in the liner the
centre of the hole. Install the packing and seal with 6 screws.
9. Trim the liner following the seal's inner edge.
10. Pull the cable through the cable connection/pipe and pull it out at the front of injection pipe.
Pull out enough cable (max 1m) to enable lifting the lamp above the water surface later. This will facilitate future changes or
winter closure.
11. If cable duct is used connect it to the junction box by the cable fitting. Junction box art. no 12310 from Pahlén can be used.
12. Pull the sealing sleeve onto the cable. The sealing sleeve should be placed in the rubber on the cable fitting.
13. Tighten the cable screw so that the cable is securely attached.
14. Insert the LED module cable into injection pipe and clamp the LED module with the front panel. Tighten it with two screws.
15. Fill the pool with water to the desired level.
126
) from the inlet pipe flange to the earth point.
2
17
Plaster
Concrete
C
ENGLISH
Wall cover
Liner
UP
Flange
UP
Sealing ring

Publicidad

loading