5. Discard the box and package in compliance with local
regulations.
9.2
INSTALL THE BLOWER TUBE
1. Align the grooves on the rear tube with tabs (6) on the
blower housing.
2. Install the rear tube onto the blower housing until the tabs
(6) engage the grooves.
3. Turn the rear tube in the direction of the arrow until the
two tabs lock into the positions.
4. Connect the front tube in the same procedure above.
9.3
CONNECT THE POWER CORD
1. Attach the extension cable to the motor housing with the
cord retainer. This prevents accidental removal of the
electrical cable.
English
2. Make a loop in the extension cord.
3. Pass it through the gap and place it over the hook.
4. Connect the female end of the electrical cable into the
10
Make sure the blower tube is in position before operation.
10.1
6
1. Pull the trigger to start the machine.
2. Pull the trigger fully to increase the speed.
3. Release the trigger to decrease the speed.
10.2
1. Release the trigger to stop the machine.
Wait until the motor stops after you stop the machine.
10.3
1. Pull the cruise control clockwise to increase the speed.
2. Push the cruise control lever counter clockwise to
If you decrease the speed all the way, the unit will stop and
it is necessary to start the machine again.
10.4
•
•
7
receptacle behind the unit.
OPERATION
WARNING
START THE MACHINE
STOP THE MACHINE
NOTE
CRUISE CONTROL
This will lock the speed at the desired setting.
decrease the speed.
NOTE
OPERATION TIPS
Blow around the outer edge of the unwanted materials to
prevent the unwanted materials from scattering.
Use rakes and brooms to clear the unwanted material
before you blow.
EN