Descargar Imprimir esta página

Kohler 5714-GCW-7 Guía De Instalación Y Cuidado página 13

Publicidad

Idiomas disponibles

Idiomas disponibles

Remote Blower
New Field Cable To Blower Motor
8. Make Power Connections - Remote
WARNING: Risk of electric shock. To reduce the risk of electric shock, connect the control to a
properly grounded Ground-Fault Circuit-Interrupter (GFCI) or Residual Current Device (RCD). This
will provide additional protection against line-to-ground shock hazard. A dedicated 220-240 V, 20 A,
50/60 Hz circuit is required.
WARNING: Risk of electric shock. Make sure the power has been disconnected before performing
the following procedures.
Ensure that the control power supply cord is properly routed to the control power junction box. The
control power supply cord contains a brown wire (Line 1), a blue wire (Line 2), and a green wire
with a yellow stripe (ground or earth).
Install a strain relief (not provided) for the power supply cable to the control power junction box.
Route the power supply cable to the control power junction box.
As required, strip the jacket and wire insulation on both cables to make the connections.
For installations in the USA, mark any white conductor in the supply power wiring with red or
black tape as required by the National Electric Code.
Connect service to the control power junction box.
Provide a separate equipment earthing or grounding conductor to the spare earth/ground lug
located on the control power junction box. This conductor must not be connected to any
current-carrying conductor. Follow local electrical codes.
Bond in accordance with national and local codes.
Clean the area of all dust and debris.
All wiring harnesses have been pre-wired at the factory. Ensure that all wires are securely fastened.
NOTE: Your wiring harness includes an antenna for the optional remote control. Do not alter or damage
this antenna during installation.
9. Complete the Installation
Test Run the Bath
Operate the heated surface user keypad to test the temperature settings.
Fill the bath to a level at least 4" (102 mm) above the top of the highest airjet.
Turn off the bath and let sit for five minutes. Check all bath piping connections for leaks. Check for
leakage along the front, sides, and back of the bath.
Kohler Co.
Typical Remote Blower Installation
Power Supply Cable
Blower Motor Cord
Control Power Junction Box
13
Control Power Supply
Second Junction Box
(added for Remote Blower)
1204120-2-C

Publicidad

loading

Este manual también es adecuado para:

K5714-gcw-7K5716-gcw-58