EN
2 / INSTALLING YOUR APPLIANCE
• ASSEMBLING THE VENTILATION
SHAFT
• Outdoor evacuation
— Calculate the fi nal height for fi xing the
duct support U-bracket (part B Pic. 1)
— Mark the two holes accordingly
— Drill 8 mm diameter holes and secure
the duct support bracket, ensuring that it is
fi xed on the same axis as the hood (part B
Pic. 1)
— Fix the fl at bracket behind the lower duct.
(part C Pic. 4).
— Place the glass on the guides. Slide the
glass in and secure it with the 4 screws
with rubber seal (glass safety). Tighten the
screws slightly.
— Fix the two ducts to the hood.
— Connect the sleeve to the air outlet to the
outside.
— Make the electrical connection to the
hood using the mains supply cable.
— Lift the upper duct up to the ceiling and
fi x it to the bracket using the screws.
Pict 4
Pict 3
26