Descargar Imprimir esta página

Haier 1U25S2SQ1FA Manual De Instalación página 4

Ocultar thumbs Ver también para 1U25S2SQ1FA:

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 29
Read the precautions in this manual
carefully before operating the unit.
Keep this manual where the user can easily nd it.
WARNING:
Ask your dealer or qualified personnel to carry out installation work.Do not attempt to install
the air conditioner yourself. Improper Installation may result in water leakage, electric shocks
, fire or explosion.
Install the air conditioner in accordance with the instructions in this installation manual
Be sure to use only the specified accessories and parts for installation work.
Install the air conditioner on a foundation strong enough to withstand the weight of the unit.
Electrical work must be performed in accordance with relevant local and national regulations
and with instructions in this installation manual,Be sure to use a dedicated power supply circuit
.
only. The wiring method should be in line with the local wiring standard.The type of connecting
wire is H07RN-F.
Use a cable of suitable length,Do not use tapped wires or an extension lead as this may cause
overheating, electric shocks, fire or explosion.
All the cables shall have got the European authentication certificate. During installation, when the
connecting cables break off, it must be assured that the grouding wire is the last one to be broken off.
If refrigerant gas leaks during installation, ventilate the area immediately.oxic gas may be
g
g
if the refrigerant comes into contact with fire,and explosion may be happen.
After completing installation, check for refrigerant gas leakage
When installing or relocating the air conditioner, be sure to bleed the refrigerant circuit to ensure
it is free of air, and use only the specified refrigerant (R32).
Make sure ground connection is correct and reliable.Do not earth the unit to a utility pipe, lightning
conductor or telephone earth lead. Imperfect earthing may result in electric shocks.
Be sure to install an earth leakage circuit explosion-proof breaker.
The breaker of the air conditioner should be all-pole switch and explosion-proof. The distance
between its two contacts should not be no less than 3mm. Such means for disconnection must be
incorporated in the wiring.
Do not use means to accelerate the defrosting process or to clean, other than those recommended by
the manufacturer.
The appliance must be stored in a room without continuously operating ignition sources, the radius of
the storage area should be no less than 2.5 m (for example:open flames, an operating gas appliance
or an operating electric heater).
Do not pierce or burn.
Be aware that refrigerants may not contain an odour.
The appliance must be installed, operated and stored in a room with a floor area larger than 3m
The room should be well ventilated.
Comply with national gas regulations.
This appliance can be used by children aged 8 years and above and persons with reduced
physical, sensory or mental capabilities or lack of experience and knowledge if they have
been given superivision or instruction concering use of the appliance in a safe way and
understand the hazards involved. Children shall not play with the appliance. Cleaning and
user maintenance shall not be made by children without supervision.
The air conditioner can not be discarded or scrapped Randomly
customer service personnel of Haier to scrap in order to obtain the correct disposal methods.
Reusable mechanical connectors and flared joints are not allowed indoor.
1
g
This appliance is filled with R32.
If you need please contact
produced

Publicidad

loading