Descargar Imprimir esta página

Watts OneFlow OF240-RM Manual De Instalación, Funcionamiento Y Mantenimiento página 3

Prevención de sarro sin sustancias químicas, sin sal

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation
Installation Drawings & Dimensions
1.
Turn off all equipment to be fed by the OneFlow
locate water supply cut-off valve and turn OFF
2.
Determine if the water line has an existing water treatment
system. If so, examine system for use of polyphospate or
other scale inhibitors. OneFlow
in conjunction with other scale inhibitors. Remove the scale
inhibitors from the water line or discontinue installation.
3.
Install a
/
" full-flow ball valve on the water supply side that
1
2
will feed the water system.
4.
Anchor the OneFlow
®
mounting material spanning wall studs. System must be
vertical and upright.
5.
Run a suitable line from the
tap water source to the inlet ball valve on the left side of
the OneFlow
system. Use 2-3 wraps of Teflon® tape and
®
brace the inlet ball valve on the system with a wrench when
connecting the feed water line.
NOTICE
DO NOT OVERTIGHTEN CONNECTION FITTING INTO
BALL VALVE.
6.
Select the appropriate size tubing for the equipment being
fed and connect it to the outlet of the OneFlow
NOTICE
DO NOT connect the tubing to the equipment at this time.
Prior to making connection to the equipment, this line will
be used to facilitate flushing the system. As an option, a
drain valve in a tee on the outlet side of the OneFlow
tem could be provided in the line to facilitate flushing when
changing filters.
7. With OneFlow
inlet valve closed, slowly open the
®
flow ball valve at the tap water source. Check for leaks.
8. If a drain valve was not installed on the outlet side of the sys-
tem, hold the tubing that will connect to equipment in a clean
bucket or over sink or drain. Open the system inlet feed valve
and allow water to flush through system for 2 minutes at the
specified system flow rate to allow air bubbles to escape.
NOTICE
NO ACTIVATION IS REQUIRED FOR THE OneFlow
TO PERFORM PROPERLY. FLUSHING IS RECOMMENDED
TO ALLOW AIR TO ESCAPE THE SYSTEM.
9. Make certain that the end of the tubing to be connected to
the equipment is clean and sanitary.
10. Connect tubing to equipment. Open all water supply valves
and check for leaks.
11. If no leaks, turn on equipment and check for normal opera-
tion.
12. Attach the Service Log to the installed OneFlow
and fill in install date.
Teflon
is a registered trademark of the E.I. Dupont de Nemours & Company.
®
system,
®
will not be effective if used
®
system on a wall stud or suitable
/
" full-flow ball valve at the
1
2
system.
®
®
system
®
sys-
®
/
" full-
1
2
system
3

Publicidad

loading