Descargar Imprimir esta página

Empire Heating Systems DV210SGXLP-2 Instrucciones De Instalación Y Manual Del Propietario página 17

Publicidad

Idiomas disponibles

Idiomas disponibles

OPTIONAL BLOWER INSTALLATION INSTRUCTIONS
Oiling the Motor
Oiling holes are provided on each end of the motor for oiling. The
blower should have five drops of #20 motor oil every 6 months.
Do not use machine oil.
Cleaning the Blower Wheel
In some areas, such as near bedrooms and on floors with a hard
surface, the blower wheel will be filled with lint very quickly. A visual
check of the blower wheel should be made after 30 days use. The
blower will run faster with a dirty wheel, but move less air. Remove
the entire blower and clean each blade of the wheel with a tooth
brush as often as necessary.
40946-0-1019
DVB-1 For Direct Vent Wall Furnaces DV210 and DV215
Index No.
Part No.
1
R-1268
2
R-896
3
R-1156
4
DV-806
5
DV-807
6
TH-111
7
R-1410
8
R-285
9
R-587
10
TH-341
11
TH-356
12
R-319
13
TH-135
14
R-315
Description
Wire Assembly
Bushing (Three Required)
Fan Control
Switch Box
Switch Box Cover
Junction Box
Bushing (Strain Relief)
Motor
Motor Cushion
Blower Cushion
Motor Support Assembly
Blower Wheel
Blower Housing Assembly
Cord Set
Page 17

Publicidad

loading

Este manual también es adecuado para:

Dv215sgxlp-2Dv210sgxnat-2Dv215sgxnat-2