Descargar Imprimir esta página

Empire Heating Systems DV210SGXLP-2 Instrucciones De Instalación Y Manual Del Propietario página 9

Publicidad

Idiomas disponibles

Idiomas disponibles

1. In selecting a location for installation, it is necessary to provide
adequate accessibility clearances for servicing and proper
installation.
2. Although certified for 0 clearance to the floor , the unit is held in
place by a wall bracket. Enough clearance [2" (51mm) suggested]
to allow changing or adding floor covering is recommended.
Other clearances to combustible construction:
Sides 1" (25mm) and 12" (305mm) from the top.
3. Note the position of the vent relative to the center of the unit.
The DV-210 has the vent in the center. The DV-215 vent is 2"
(51mm) off center to the right.
4. The minimum distance from the center of the outside vent to
the nearest outside corner or obstruction is 16" (406mm).
5. The DV-210/DV-215 minimum wall depth is 4 1/2" (114mm)
and maximum wall depth is 13" (330mm). The use of tubes not
supplied by the manufacturer result in unsatisfactory performance.
The furnace is to be located on an outside wall. Locate wall studs so
that wall opening will be located between wall studs. One wall stud
can be used for attachment of inside wall plate. The wall opening
required as shown in Figure 3 is a minimum diameter of 6 1/4
(159mm) inches. The inside wall plate and the outside wall plate are
large enough to permit a wall opening diameter of 8 inches (203mm).
A template is provided in furnace carton for positioning furnace on
the wall. Also, refer to Figure 3 for positioning the furnace on wall
and for locating gas line connection.
40946-0-1019
CLEARANCES
INSTALLATION INSTRUCTIONS
Figure 3
The vent terminal of a direct vent appliance, with an input of 10,000
Btu per hour (3 kW) or less shall be located at least 6" (150mm)
from any air opening into a building, and such an appliance with an
input over 10,000 Btu per hour (3 kW) but not over 50,000 Btu per
hour (14.7 kW) shall be installed with a 9" (229mm) vent terminal
clearance and the bottom of the vent terminal and the air intake
shall be located at least 12" (305mm) above grade.
The nearest point of the vent cap should be a minimum
horizontal distant of six (6) feet (1.8m) from any pressure
regulator. In case of regulator malfunction, the six feet (1.8m)
distance will reduce the chance of gas entering the vent cap.
The maximum wall depth may be extended to 19" (483mm) by us-
ing the vent extension kits listed on page 7.
Installing Inside Wall Plate
After the wall opening has been located and cut, center and level
inside wall plate in wall opening. The collar on the inside wall plate
is to be placed within the wall opening. If there is insulation above
the wall opening (air inlet tube) a barrier should be installed above
the wall opening (air inlet tube) to prevent insulation from coming in
contact with the air inlet tube. The barrier must not penetrate into the
6-1/4" (159mm) diameter wall opening. On solid wall or wall stud,
attach inside wall plate with (6) #10 x 1 1/2" (38mm) screws provided.
On sheet rock wall, by using wall opening for access, attach inside
wall plate with (6) #10 x 1 1/2" (38mm) screws and (6) Tinnerman
nuts provided.
Attaching Furnace To Inside Wall Plate
Align and attach mounting clips on furnace back with mounting slots
on inside wall plate. The furnace support bracket located at furnace
bottom is to be secured to wall. On solid wall, secure furnace support
bracket with (1) #10 x 1 1/2" (38mm) screw provided. On sheet rock
wall, secure furnace support bracket with (1) toggle bolt provided.
CAUTION
(64mm)
(13mm)
Figure 4
Page 9

Publicidad

loading

Este manual también es adecuado para:

Dv215sgxlp-2Dv210sgxnat-2Dv215sgxnat-2