Descargar Imprimir esta página

Welbach ENTRIX 200D Manual De Instrucciones página 32

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 134
a - Long cap, rear
b - Collet
c - Torch holder
d - Collet in housing
e - Ceramic nozzle
7. Connecting the wires
Checking the tightness of gas connections
Before first use and then at regular intervals, it is recommended to check for gas leaks. The procedure should be
carried out as follows:
1) Connect the regulator and gas line assembly and tighten all connections and clamps.
2) Slowly open the cylinder valve.
3) Set the flow rate on the controller to approximately 8-10 l/min.
4) Close the cylinder valve and watch the pressure gauge needle on the regulator. If the needle drops towards
zero, it means there is a gas leak. Occasionally, the gas leakage can be slow. To identify it, leave the gas
pressure in the regulator and the line for a long time (about 15 minutes).
5) In the event of a gas leak, check all connections and terminals for leaks. Brushing or spraying with soapy
water will cause bubbles to appear at the location of the leak.
6) Tighten clamps or couplings to eliminate gas leakage.
IMPORTANT! - It is recommended to check for gas leakage before starting the machine. It is recommended to close
the cylinder valve when the machine is not in use.
MMA welding mode:
1) Connect the welding cable to the connection marked with "+" and twist the cable plug to secure the
connection.
2) Connect the ground wire to the connection marked with "-" and twist the wire connector to secure the
connection.
3) Connect the power cord and turn on the power.
4) Connect the ground wire to the workpiece. Once these steps are completed, welding can begin.
CAUTION! Cable polarity may vary! All polarity information should be described on the package provided by
the electrode manufacturer!
TIG welding mode
1) Connect the ground cable to the connection marked with "+" and twist the cable plug to secure the
connection.

Publicidad

loading