Installation Instructions
3. PREPARE THE AIR CONDITIONER
(continues)
Remove the ground screw from the left
E.
need them later in the installation.
Slide the air conditioner from the case by
F.
gripping the base pan handle and pulling
forward while bracing the case. Do not pull or
lift on the foam discharge area.
4. PREPARE THE CASE
Attach the top rail gasket to the bottom of
A.
the top rail.
Install the top mounting rail with 4 type A
B.
screws from the inside of the case. Press
firmly to drive the screws into the gasket and
through the top mounting rail.
Top mounting rail
49-7798
4. PREPARE THE CASE
C. Slide each side retainer onto the edge of each
according panel. The figure shows the orientation
of each accordion panel and side retainer assembly
relative to the case from a top view of the unit.
D. Remove the backing from the accordion seal (two
Do not
short strips). Stick one sealing strip respectively
pull or
lift in this
on the left side and right side of the accordion
area—
panels, as shown.
damage
to the
unit may
result
FRONT
E. Slide the left and right accordion panels into the
top and bottom mounting rails.
F.
type A screws.
SIDE RETAINER
WINDOW FILLER PANEL
SIDE RETAINER
WINDOW FILLER PANEL
Top mounting rail
Top left
Top right
11