Descargar Imprimir esta página

Brizo MultiChoice T75P660-GL Instrucciones De Instalación página 8

Válvula de presión balanceada con accesorios integrados de 3 o 6 desvíos

Publicidad

Idiomas disponibles

Idiomas disponibles

75P Series Installation
4
Trim Installation
A.
3
1
Trim Sleeve Installation
Insert Spacer (3) into the sleeve (1) and push it to
the front. Slide trim sleeve (1) over the bonnet (2),
valve cartridge and rough-in body.
Ensure sleeve is properly positioned over the front
of cartridge.
C.
3
1
Slide over valve cartridge (6) and bonnet (7).
Slide escutcheon cover (3) over trim sleeve (4) onto
escutcheon and hand tighten trim nut (1) provided
onto diverter sleeve (2) until secure.
Note: For thick wall installation, order
installation kit RP100160 to support finished
wall thickness up to 2 1/8".
101690 Rev. B
2
2
4
B.
1
3
Escutcheon Installation
For finished wall thickness up to 1 1/8". Slide
o-ring (4) over cartridge and bonnet. Secure
the escutcheon (1) to the rough-in body (2)
using 4 screws (3) provided. Do not over tighten
escutcheon screws.
D.
2
3
4
Valve Handle Installation
Install valve handle (2) with screw (3). Applying
pressure, insert button (4) until properly seated.
6
2
4

Publicidad

loading